Lokalizacja turbin wiatrowych

VALOREM has identified the potential site for the project based on criteria specific to the installation of wind turbines:
• A distance of at least 700 metres from residential properties,  
• Good exposure to the prevailing wind,
• A new substation infrastructure nearby. 

Feasibility studies will then be able to determine the wind farm’s specifications (number of wind turbines, location and size).

The chosen layout comprises seven wind turbines, each with a tip height of 300 metres. Whilst ensuring optimal electricity generation, it strikes a balance between blending into the landscape and taking environmental considerations into account.

Studium wykonalności projektu

Covering a range of topics, the feasibility study provides a detailed analysis of the specific characteristics of your area. It is carried out by a multidisciplinary team of independent experts (naturalists, landscape architects, acousticians, architects, surveyors, etc.) and helps to determine the wind farm’s specifications (number of wind turbines, location, dimensions).